MANAGING THE SEDIMENT LOAD IN TIDAL RIVER MANAGEMENT (TRM)
Umme Kulsum Navera(1) and Md. Monirul Islam(2) 1 Department of Water Resources Engineering, BUET, Dhaka 1000, Bangladesh. 2 Department of Water Resources Engineering, BUET, Dhaka 1000, Bangladesh.
Guardado en:
| Autores principales: | , |
|---|---|
| Formato: | Artículo |
| Lenguaje: | inglés |
| Publicado: |
R&D Wing, MIST
2020
|
| Acceso en línea: | http://hdl.handle.net/123456789/528 |
| Etiquetas: |
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares: MANAGING THE SEDIMENT LOAD IN TIDAL RIVER MANAGEMENT (TRM)
- HEAVY METAL CONTAMINATION OF THE SEDIMENT OF THE SHITALAKHYA RIVER /
- HEAVY METAL CONTAMINATION OF THE SEDIMENT OF THE TURAG RIVER /
- Prospect of tidal energy in Bangladesh
- DEVELOPMENT OF A NATURE BASED PERMEABLE GROIN-LIKE HYDRAULIC STRUCTURE FOR TIDAL RIVER BANK STABILIZATION /
- Erosion and Sedimentation /
- Sediment Transport Technology : Water and Sediment Dynamics /