MANAGING THE SEDIMENT LOAD IN TIDAL RIVER MANAGEMENT (TRM)
Umme Kulsum Navera(1) and Md. Monirul Islam(2) 1 Department of Water Resources Engineering, BUET, Dhaka 1000, Bangladesh. 2 Department of Water Resources Engineering, BUET, Dhaka 1000, Bangladesh.
Uloženo v:
| Hlavní autoři: | , |
|---|---|
| Médium: | Článek |
| Jazyk: | angličtina |
| Vydáno: |
R&D Wing, MIST
2020
|
| On-line přístup: | http://hdl.handle.net/123456789/528 |
| Tagy: |
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
Podobné jednotky: MANAGING THE SEDIMENT LOAD IN TIDAL RIVER MANAGEMENT (TRM)
- HEAVY METAL CONTAMINATION OF THE SEDIMENT OF THE SHITALAKHYA RIVER /
- HEAVY METAL CONTAMINATION OF THE SEDIMENT OF THE TURAG RIVER /
- Prospect of tidal energy in Bangladesh
- DEVELOPMENT OF A NATURE BASED PERMEABLE GROIN-LIKE HYDRAULIC STRUCTURE FOR TIDAL RIVER BANK STABILIZATION /
- Erosion and Sedimentation /
- Sediment Transport Technology : Water and Sediment Dynamics /