Lua APA (7ú heag.)
HOSSAIN, S. M. A. (2021). APPLICATION OF CONSTRUCTED FLOATING WETLAND (CFW) IN TREATING URBAN WASTE WATER: A CASE STUDY ON HATIRJHEEL LAKE. DEPARTMENT OF CIVIL ENGINEERING.
Lua i Stíl Chicago (17ú heag.)
HOSSAIN, S M ANWAR. APPLICATION OF CONSTRUCTED FLOATING WETLAND (CFW) IN TREATING URBAN WASTE WATER: A CASE STUDY ON HATIRJHEEL LAKE. DEPARTMENT OF CIVIL ENGINEERING, 2021.
Lua MLA (9ú heag.)
HOSSAIN, S M ANWAR. APPLICATION OF CONSTRUCTED FLOATING WETLAND (CFW) IN TREATING URBAN WASTE WATER: A CASE STUDY ON HATIRJHEEL LAKE. DEPARTMENT OF CIVIL ENGINEERING, 2021.
Rabhadh: Seans nach mbeach na luanna seo go hiomlán cruinn i ngach uile chás.