Cita APA (7th ed.)
Imam, M. H., & Sharmin, A. (2012). GEOMETRIC DESIGN ANALYSIS OF MIRPUR TO AIRPORT ROAD INTERCHANGE AND OVERPASS AT BANANI RAIL CROSSING IN ACCORDANCE WITH STANDARD GUIDELINES. CE DEPT. MIST.
Cita Chicago (17th ed.)
Imam, Md. Hasan, i Afsana Sharmin. GEOMETRIC DESIGN ANALYSIS OF MIRPUR TO AIRPORT ROAD INTERCHANGE AND OVERPASS AT BANANI RAIL CROSSING IN ACCORDANCE WITH STANDARD GUIDELINES. Dhaka: CE DEPT. MIST, 2012.
Cita MLA (9th ed.)
Imam, Md. Hasan, i Afsana Sharmin. GEOMETRIC DESIGN ANALYSIS OF MIRPUR TO AIRPORT ROAD INTERCHANGE AND OVERPASS AT BANANI RAIL CROSSING IN ACCORDANCE WITH STANDARD GUIDELINES. CE DEPT. MIST, 2012.
Atenció: Aquestes cites poden no estar 100% correctes.