APA (7e ed.) Bronvermelding
Mobashir,A.B.M.Hosnee. (2019). DESIGN AND SIMULATION OF A ROBUST NETWORK FOR AN INSTITUTION INCLUDING COST EVALUATION. CSE DEPT.MIST.
Chicago (17e ed.) Bronvermelding
Mobashir,A.B.M.Hosnee. DESIGN AND SIMULATION OF A ROBUST NETWORK FOR AN INSTITUTION INCLUDING COST EVALUATION. Dhaka: CSE DEPT.MIST, 2019.
MLA (9e ed.) Bronvermelding
Mobashir,A.B.M.Hosnee. DESIGN AND SIMULATION OF A ROBUST NETWORK FOR AN INSTITUTION INCLUDING COST EVALUATION. CSE DEPT.MIST, 2019.
Let op: Deze citaties zijn niet altijd 100% accuraat.