IMPROVING OVERALL EQUIPMENT EFFICTIVENESS BY APPLYING TPM-A CASE OF DETERGENT MANUFACTURING FACTORY /
Saved in:
| Institution som forfatter: | |
|---|---|
| Andre forfattere: | , |
| Format: | Bog |
| Sprog: | engelsk |
| Udgivet: |
Dhaka :
IPE DEPT.MIST
c2019
|
| Fag: | |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
MARC
| LEADER | 00000nam a22000007a 4500 | ||
|---|---|---|---|
| 001 | TP-1447 | ||
| 003 | BD-DhMIS | ||
| 005 | 20201231095501.0 | ||
| 008 | 201231t2013 B ||||| |||| 00| 0 eng | ||
| 040 | |a BD-DhMIS |c BD-DhMIS | ||
| 100 | |4 Chowdhury,Humayra Zerin | ||
| 245 | |a IMPROVING OVERALL EQUIPMENT EFFICTIVENESS BY APPLYING TPM-A CASE OF DETERGENT MANUFACTURING FACTORY / |c Humayra Zerin Chowdhury, S.M.Foysal Haque, SK.Fatema Akter | ||
| 260 | |a Dhaka : |b IPE DEPT.MIST |c c2019 | ||
| 300 | |a xi,62p. : |b ill. ; |c 29cm | ||
| 504 | |a Includes bibliographical references | ||
| 541 | |e TP-1447 | ||
| 650 | |a This thesis paper of IPE in B.Sc program | ||
| 650 | |a Industrial and Production Engineering | ||
| 700 | |a S.M.Foysal Haque | ||
| 700 | |a SK.Fatema Akter | ||
| 710 | |a Supervised by Dr.A.K.M Masud |e Professor of the Dept,IPE.BUBT | ||
| 942 | |2 ddc |c TP | ||
| 952 | |0 0 |1 0 |2 ddc |4 0 |6 1447_000000000000000_B_SC_IPE_2019 |7 0 |9 62387 |a MISTCL |b MISTCL |d 2020-12-31 |e IPE Dept . |l 0 |o 1447 B.Sc IPE 2019 |p TP-1010001447 |r 2020-12-31 00:00:00 |t 1 |w 2020-12-31 |y TP | ||
| 999 | |c 8131 |d 8131 | ||