DETERMINATION OF EFFICIENT POWER REQUIREMENT FOR AN IMPROVISED LANDING CRA TANK HAVING DRAFT RESTRICTION UNDER OPERATIONAL CONDITIONS /
Kaydedildi:
| Yazar: | |
|---|---|
| Müşterek Yazar: | |
| Diğer Yazarlar: | , , |
| Materyal Türü: | Kitap |
| Dil: | İngilizce |
| Baskı/Yayın Bilgisi: |
Dhaka :
NAME DEPT MIST ,
C 2017.
|
| Konular: | |
| Etiketler: |
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller: DETERMINATION OF EFFICIENT POWER REQUIREMENT FOR AN IMPROVISED LANDING CRA TANK HAVING DRAFT RESTRICTION UNDER OPERATIONAL CONDITIONS /
- AN ANALYSIS ON EFFICIENCY OF NATURAL DRAFT COOLING TOWER WITH DIFFERENT QUANTITY OF CIRCULATING FLUIDS
- Drafting : technology and practice /
- Drafting : technology and practice /
- Metric Drafting /
- Drafting for industry /
- DETERMINATION OF IRRIGATION WATER REQUIREMENT OF BORO RICE USING CROPWAT 8.0 FOR MADARIPUR DISTRICT