Cost estimating for engineering and management
Sparad:
| Huvudupphov: | |
|---|---|
| Materialtyp: | Bok |
| Språk: | engelska |
| Utgiven: |
Englewood Cliffs, N.J.,
Prentice-Hall
[1974]
|
| Serie: | Prentice-Hall international series in industrial and systems engineering
|
| Ämnen: | |
| Taggar: |
Inga taggar, Lägg till första taggen!
|
MARC
| LEADER | 00000cam a2200000 4500 | ||
|---|---|---|---|
| 001 | 44463 | ||
| 003 | OSt | ||
| 005 | 20140715132554.0 | ||
| 008 | 731015s1974 njua b 001 0 eng | ||
| 010 | |a 73018034 | ||
| 020 | |a 0131811312 | ||
| 040 | |a DLC |c DLC |d DLC | ||
| 082 | 0 | 0 | |a 658.1/55 |
| 100 | 1 | |a Ostwald, Phillip F., |d 1931- | |
| 245 | 1 | 0 | |a Cost estimating for engineering and management |c [by] Phillip F. Ostwald. |
| 260 | |a Englewood Cliffs, N.J., |b Prentice-Hall |c [1974] | ||
| 300 | |a xiii, 493 p. |b illus. |c 29 cm. | ||
| 490 | 0 | |a Prentice-Hall international series in industrial and systems engineering | |
| 504 | |a Includes bibliographies. | ||
| 541 | |e 44463 | ||
| 650 | 0 | |a Engineering |x Estimates. | |
| 906 | |a 7 |b cbc |c orignew |d 1 |e ocip |f 19 |g y-gencatlg | ||
| 942 | |2 ddc |c REF | ||
| 952 | |0 0 |1 0 |2 ddc |4 0 |6 658_155000000000000_OST |7 0 |9 37417 |a MISTCL |b MISTCL |d 2014-07-15 |e Karim Intl |g 2250.00 |l 0 |o 658.1/55 OST |p 3010044463 |r 2014-07-15 00:00:00 |t 1 |w 2014-07-15 |y REF | ||
| 999 | |c 4162 |d 4162 | ||